Green Pin BigMouth® Dee Shackle SC: Faster Assembly for Sheet Pile Wall Lifting

December 19, 2025

GREEN PIN BIGMOUTH® DEE SHACKLE SC: REVOLUTIONARY FASTER ASSEMBLY FOR SHEET PILE WALL LIFTING

We are thrilled to announce the launch of the industry's first BigMouth® shackle with screw pin technology—the Green Pin BigMouth® Dee Shackle SC (G-4551). This groundbreaking addition to the Green Pin® rigging portfolio revolutionizes sheet pile wall lifting by combining speed, flexibility, and uncompromising durability for jobs where every minute counts.


WHY SPEED MATTERS IN SHEET PILE LIFTING

Sheet pile wall projects demand efficiency without sacrificing safety. Traditional rigging equipment often requires time-consuming assembly and disassembly processes that can add hours to project schedules. The new Green Pin BigMouth® Dee Shackle SC directly addresses this challenge with its innovative screw pin design—enabling faster rigging setup and teardown on every job.

For contractors managing tight timelines and complex lifting operations, this innovation translates directly to cost savings and improved project profitability.


INTRODUCING THE GREEN PIN BIGMOUTH® DEE SHACKLE SC

The BigMouth® Dee Shackle SC represents a significant engineering achievement. Unlike standard shackles, this model features:

• Enlarged internal width and length—accommodating unconventional lifting points where traditional shackles simply don't fit
• Screw pin mechanism—enabling rapid assembly and disassembly without sacrificing security
• Hot-dipped galvanized finish—providing superior corrosion resistance and long-term durability
• Versatile design—suitable for both single-leg and multi-leg rigging systems


KEY BENEFITS AT A GLANCE

✓ Longer inside length and wider inside width for non-standard lifting points
✓ Perfect for lifting steel sheet pile walls and similar applications
✓ Screw pin enables quick (dis)assembly—save time on every job
✓ Galvanization assures long-term durability and corrosion resistance
✓ Suitable for both single-leg and multi-leg rigging systems
✓ Engineered to perform in the toughest lifting conditions


REAL-WORLD APPLICATIONS

The Green Pin BigMouth® Dee Shackle SC is specifically engineered for challenging lifting scenarios:

SHEET PILE WALL PROJECTS

For temporary and permanent sheet pile wall construction, this shackle's enlarged dimensions accommodate the unique geometry of pile walls while the screw pin feature dramatically reduces setup time between lifts.

COMPLEX STRUCTURAL LIFTING

When standard rigging points are unavailable or non-traditional attachment methods are required, the BigMouth® design provides the flexibility contractors need without compromising safety or performance.

MULTI-LEG LIFTING OPERATIONS

The shackle's versatility makes it ideal for complex multi-leg rigging systems where precise load distribution and quick equipment changes are essential.


ENGINEERING EXCELLENCE MEETS PRACTICAL INNOVATION

The screw pin design isn't just about speed—it's about smart engineering. The mechanism is:

• Intuitive to operate—minimal training required for crew members
• Reliable under load—engineered to perform consistently across thousands of operations
• Durable in harsh environments—the galvanized finish resists corrosion from weather, saltwater, and industrial exposure


WHY CHOOSE GREEN PIN® RIGGING EQUIPMENT?

Green Pin® has been the centerpiece of professional rigging for decades. The BigMouth® Dee Shackle SC continues this legacy by delivering exactly what contractors need: exceptional quality, innovative design, and equipment they can trust on critical jobs.


PRODUCT SPECIFICATIONS

Model: Green Pin BigMouth® Dee Shackle SC (G-4551)
Pin Type: Screw Pin (Quick Assembly/Disassembly)
Finish: Hot-Dipped Galvanized
Interior Dimensions: Enlarged Width & Length (vs. standard shackles)
Application: Sheet Pile Walls, Complex Lifting, Multi-Leg Systems
Rigging Configurations: Single-Leg & Multi-Leg Systems


THE GREEN PIN® COMMITMENT TO YOUR SUCCESS

At Green Pin®, we understand that rigging equipment is foundational to your project success. Whether you're managing sheet pile wall construction, complex structural lifting, or challenging jobsite conditions, the BigMouth® Dee Shackle SC is engineered to exceed expectations.

This latest innovation is just another example of how Green Pin® continues to evolve our product lineup to meet the real-world needs of professional contractors.


READY TO UPGRADE YOUR RIGGING EQUIPMENT?

The Green Pin BigMouth® Dee Shackle SC represents a smart investment in efficiency, durability, and safety. Whether you're planning your next sheet pile wall project or need versatile rigging equipment for challenging applications, we recommend exploring this innovative solution.

Contact Daubner today to learn more about the BigMouth® Dee Shackle SC and how it can improve your project timelines and bottom line.


---

ABOUT DAUBNER

Daubner specializes in premium rigging equipment and industrial supplies for construction, industrial, and infrastructure projects across multiple states. We partner with leading manufacturers like Green Pin® to bring innovative solutions to contractors and engineers who demand excellence.

Green Pin® is a registered trademark. Specifications and availability subject to change.